Several new power plants are in the process of obtaining cooling water discharge permits from DEQ. The table below is a summary of where each facility is in the permitting process.

Name Permit Status Permit Status Date Construction Status Cooling Water Source Receiving Water Intake Volume (MGD) Discharge Volume (MGD) Latitude
(Point of Discharge)
Longitude
(Point of Discharge)
Facility Legal Description County
Associated Electric Cooperative - Choteau Plant Issued 3/14/2000 Completed Mid-America Industrial Park Grand Neosho River 0 1 36.2186 -95.2467 NW¼ of NE¼ of Section 10, Township 20N, Range 19E, Indian Meridian Mayes
Kiowa Power Partner Issued 8/9/2001 Completed Lake Eufaula Peaceable Creek 12.8 1.687 36.218 -95.246 NW¼ ,of SW¼of NW¼ , Section 13 Township4N, Range14EIM Pittsburgh
Jenks Issued 2/18/2000 Completed Tulsa Water Plant Arkansas River 3.7 0.924 35.9831 -95.0319 NE¼,SE¼, NW¼,Section4, Township 17, Range13EIM Tulsa
Redbud Energy LP Withdrawn 9/19/2002 Withdrawn North Canadian Wastewater Treatment North Canadian River 11.3 2.34 35.5978 -97.3003 NW¼,SW¼,Sw¼, Section 15, Township 17N, Range 13EIM Oklahoma
OG&E Horseshoe Lake Issued 5/29/2000 Completed Groundwater Horseshoe Lake 0 0.058 35.5972 -97.1831 NE¼,NW¼,SE¼,Section 15, Township12, Range1EIM Oklahoma
Smith Pocola Energy Project EPA Review 9/30/2002 Not yet constucted Poteau River Poteau River 11.8 2.4 35.2958 -94.4572 NE¼,NW¼,SW¼, Section33, Township10N, Range27EIM LeFlore
Western Farmers Electric Coop. Modified 12/14/2000 Completed Ft Cobb Reservoir Washita river 0.312 0.17 35.0861 -98.2303 NE¼,NW¼,NW¼, Section 14, township 7N, Range10WIM Caddo
Eagle Energy, Energetix Issued 12/5/2001 Not yet constucted Webbers Falls Reservoir Webbers Falls Reservoir 7.53 0.914 35.5844 -95.2194 SW¼,NE¼,SE¼, Section 19, Township13, Range 1EIM Muskogee
Thunderbird Energy Plant, Energetix Public Comment 11/19/2001 Not yet constucted City of Norman Wastewater Treatment Canadian River 8 1.75 35.1547 -97.4381 SE¼,NW¼, Section 25, Township9, Range1EIM Cleveland
Duke Energy McClain Issued 3/1/2001 Completed Moore POTW and S. OKC POTW Total Retention 4.1 1.1 0 0 Lots 2 and 3, N1/2, S1/2, Section 35, Township 10N, Range 4WIM McClain
Calpine Oneta Power Public Comment Period 3/8/2002 Completed Verdigris Arkansas 10.72 1.26 35.9064 -95.7461 SW¼,NE¼,SE¼, Section 31, Township 17 N, Range 15EIM Wagoner
Great Plain, Enegetix Permit Application withdrawn 3/5/2002 Withdrawn City of Lawton POTW Ninemile Creek 5.16 0.92 34.5153 -98.3647 SW¼,SE¼,NW¼, Section 33, Township 1 N, Range 11WIM Comanche
Lawton Energy Plant, Energetix Issued 10/10/2002 Not yet constucted City of Lawton POTW East Cache Creek 2.3 0.77 34.5025 -98.3619 NE¼,SW¼,NW¼, Section 4, Township 1 S, Range 11WIM Comanche
Genova Oklahoma I Power Plant Issued 5/1/2003 Not yet constucted Chickasha POTW & Fort Cobb Reservoir Washita River 5.45 1.1 35.014 -97.895 NE¼, SW¼,Section 1, Township 6N, Range 7WIM Grady
OneOK Application has not been received 6/10/2002 0 0 0 0
Smith CoGen Application has not been received 6/10/2002 0 0 0 0
Tenaska Seminole Application has not been received 6/10/2002 0 0 0 0
Mustang Power Canadian County Application has not been received 6/10/2002 0 0 0 0
Mustang Power Harrah Application has not been received 6/10/2002 0 0 0 0
Duke Energy Stephens County Application has not been received 6/10/2002 0 0 0 0
KM Power Application has not been received 6/10/2002 0 0 0 0