P.O. Box 1677, Oklahoma City, Oklahoma 73101-1677 |
Fact Sheet |
TITLE V OIL & GAS FACILITIES
WHAT IS TITLE V?
Title V of the Federal Clean Air Act Amendments of 1990 (CAAA) required development of permit programs that would require major sources of air emissions throughout the U.S. to obtain an operating permit. These operating permits are referred to as "Title V permits," or "Part 70 permits" since EPA issued rules for State Title V Programs under 40 CFR, Part 70. The Oklahoma Department of Environmental Quality (DEQ) has obtained authority and approval from EPA to administer the program for Oklahoma, effective March 6, 1996. Oklahoma received approval to implement a 3-year phased application submittal schedule, with all permits to be issued within five years. Although Oklahoma has required an operating permit for both major and minor sources for a number of years, Title V requires all existing major facilities to submit an application for a new Title V operating permit during this three-year phase-in. A separate DEQ Title V Program Fact Sheet is available, which gives more details on the program.
AM I A TITLE V SOURCE?
In general, a Part 70 permit is required of those facilities with the potential-to-emit (PTE) of 100 TPY or more of any criteria pollutant (NOx, CO, SO2, Ozone (as VOCs), PM10, and Lead), or 10 TPY or more of any one Hazardous Air Pollutant (HAP), or 25 TPY or more of any combination of HAPs. If prior to the facilitys Title V application submittal deadline a facility has applied for a minor permit which would limit emissions below the threshold levels mentioned above (i.e., by requiring operational constraints and/or control equipment), a Part 70 permit would not be required. Otherwise, PTE is calculated as if no air pollution control equipment is in place and all operations are continuous. Facilities in the Oil and Gas industry have the potential to emit several criteria pollutants and HAPs. An emissions inventory should be performed at your facility to determine if you exceed any of the Title V thresholds. Please see the DEQ Fact Sheet on PTE for the general process in calculating PTE, or the attached example for gas compression and dehydration stations.
Certain other sources, e.g., any affected source subject to the Acid Rain Rules, and any solid waste incinerator subject to Section 129(e) of the CAA, are required to obtain a Part 70 permit regardless of their PTE. In addition, sources subject to an NSPS or NESHAP would have to obtain a Part 70 permit only if the subpart specifically required them to do so. Note that at this time, no Oil & Gas facilities are currently required to obtain a Part 70 permit specifically because of an NSPS.
Several NESHAPs may be applicable now to operations at Oil & Gas facilities. In addition, several NESHAPs are scheduled for promulgation in the near future which may also be applicable to these operations. Those NESHAPs currently effective include:
Source Category
Promulgation Date
40 CFR 61 Subpart
Equipment Leaks (Benzene)
6/6/84
Subpart J
Equipment Leaks
6/6/84
Subpart V
Source Category
Promulgation Date
40 CFR 63 Subpart
Petroleum Refineries
8/18/95
Subpart CC
Gasoline Distribution Facilities
12/14/94
Subpart R
Hazardous Organic NESHAP
4/22/94
Subpart F, G, H, I
Degrease Organic Cleaners*
12/02/94
Subpart T
Off-site Waste Treatment
7/01/96
Subpart DD
Industrial Cooling Towers**
9/08/94
Subpart Q
*Applies to major sources as well as area sources. However, applicability to area sources has been deferred until December 9, 1999. Title V applications for deferred area sources are due by December 9, 2000.
**Applies to those cooling towers using chromium compounds.
Those NESHAPs scheduled for promulgation in the future that may potentially affect operations at Oil & Gas facilities include:
Source Category
Promulgation Date
Oil & Natural Gas Production
11/15/97
Petroleum Refineries
11/15/97
Industrial Boilers
11/15/00
Process Heaters
11/15/00
Stationary IC Engines
11/15/00
Stationary Turbines
11/15/00
Note that most NESHAPs apply only to major sources. However, there are some that apply to area (minor) sources as well as major sources. In particular, the Halogenated Solvent Cleaning NESHAP applies to both major and minor sources. However, this NESHAP has been deferred until December 9, 1999, with Title V applications due by December 9, 2000. The Halogenated Solvent Cleaning NESHAP applies to certain solvent cleaning sources using methylene chloride, perchloroethylene, trichloroethylene, 1,1,1-trichloroethane, carbon tetrachloride, or chloroform at both major and minor source facilities.
Use of a solvent cleaner subject to this NESHAP could require a Part 70 permit for the entire facility, even if it is a minor source (see the specific NESHAP for more details). Note that NESHAPs require an initial notification of NESHAP status. In lieu of this notification, a facility may submit an application for a Part 70 permit. Depending on the notification date, and your Title V submittal date, you may want to submit a Title V application in lieu of the NESHAP notification.
NSPS SUBPARTS OF CONCERN & EFFECTIVE DATES
Subpart K: Storage Vessels for Petroleum Liquids (between June 11, 1973, and May 19, 1978)
Subpart Ka: Storage Vessels for Petroleum Liquids (between May 18, 1978, and July 23, 1984)
Subpart Kb: Storage Vessels for Volatile Organic Liquids, (Including Petroleum Liquids), (after July 23, 1984)
Subpart GG: Stationary Gas Turbines (after October 3, 1977)
Subpart XX: Bulk Gasoline Terminals (after December 17, 1980)
Subpart KKK: Equipment Leaks of VOC from Onshore Natural Gas Processing Plants (after January 20, 1984)
Subpart LLL: Onshore Natural Gas Processing; SO2 Emissions (after January 20, 1984)
STATE RULES OF CONCERN
Subchapter 7: New Source Permits (effective date: October 1972)
Subchapter 8: Part 70 Permits (effective date: March 6, 1996)
Subchapter 9: Excess Emissions Reporting (affects both new and existing)
Subchapter 10: General Operating Permits for the Crude Petroleum and Natural Gas Industry (effective date: July 1, 1996)
Subchapter 19: Particulate Matter Emissions from Fuel-burning Equipment (affects both new and existing)
Subchapter 25: Smoke, Visible Emissions, and Particulates (affects both new and existing)
Subchapter 29: Fugitive Dust (affects both new and existing)
Subchapter 31: Sulfur Compounds (affects both new and existing)
Subchapter 33: Nitrogen Oxides (effective date: October 1971)
Subchapter 37: Organic Materials (affects both new and existing)
Subchapter 39: Organic Materials (affects both new and existing units in Tulsa and Oklahoma Counties)
Subchapter 41: Hazardous and Toxic Air Contaminants (affects both new and existing)
DO EXPLORATION & PRODUCTION SOURCES NEED A PART 70 PERMIT?
Air emissions or potential for air emissions required or requested to be permitted under the Clean Air Act are under the jurisdiction of the DEQ. All sources of air emissions of regulated pollutants from oil and gas exploration and production which are less than Title V major source thresholds are the jurisdiction of the Oklahoma Corporation Commission (OCC), except those which may be covered by NSPS, NESHAPs, PSD, or other applicable federal regulations requiring an air quality permit. Any source under OCC jurisdiction that elects to submit a permit application or applicability determination request to DEQ may do so.
Typical exploration and production equipment with emissions of criteria or hazardous air pollutants include the following:
Tanks and Vessels |
Fugitive Sources |
-hydrocarbon |
-valves |
-non-fired separators |
-flanges |
-produced water |
-compressor seals |
-threaded fittings |
-relief valves |
External Combustion Sources |
|
-line heaters |
|
-heater treaters |
Flares |
-glycol dehydrator burners |
|
-incinerators |
Glycol Dehydrator Reboiler Vents |
-boilers |
|
|
Sulfur Recovery Unit |
Internal Combustion Engines |
-sulfur removal units |
(reciprocating or turbine) |
|
-compressors |
Miscellaneous |
-pumps |
-sump tanks |
-generators |
-waste water ponds |
-pumping units |
-bleed-type controllers |
|
-cooling towers |
Tank Truck Loading |
-vents not included above |
Each of these emission sources would be included or exempt from DEQ jurisdiction and the concurrent Title V permitting process based not on the type of source, but rather on the emission rate.
WHAT PERMITTING OPTIONS ARE AVAILABLE?
If you are a true minor source, i.e., your PTE is less than Title V thresholds, under DEQ jurisdiction you are still required to have a DEQ-issued minor-source operating permit if emissions of any criteria pollutant exceed 1 lb/hr, or if emissions of any toxic air pollutant exceed the de minimis level given in DEQ rules (OAC 252:100-41-43). If your PTE exceeds Title V thresholds, but you are able to limit emissions to below those thresholds you may be eligible for a "synthetic minor" permit. In general, permit limitations on PTE in a synthetic minor permit must be federally enforceable. See the DEQ Fact Sheet on PTE for more details. If you cannot, or chose not to limit your PTE to below Title V thresholds, then you are required to apply for a Part 70 permit by the submittal schedule deadline for your particular type of facility. Those petroleum and natural gas facilities whose SIC codes include 1311 (Petroleum and Natural Gas), 1321 (Natural Gas Liquids), 4922 (Natural Gas Transmission), or 4923 (Natural Gas Transmission & Distribution), may be eligible for coverage under the General Operating Permit for Crude Petroleum and Natural Gas Facilities (GOP). The GOP is a streamlined Part 70 permit with pre-determined equipment criteria and emission limitations, and a simplified issuance process.
WHEN ARE TITLE V APPLICATIONS DUE?
DEQ has received approval to implement a three year phased submittal schedule with all permits to be issued after five years. The effective date for this schedule is March 6, 1996. The first group of applications for oil and gas facilities include one third of all petroleum and natural gas (SIC 1311), natural gas liquids (SIC 1321), natural gas transmission (SIC 4922), natural gas transmission and distribution (SIC 4923), and petroleum bulk stations and terminals (SIC 5171). Applications for this first group were due by September 5, 1996. The second group includes the remaining two thirds of the first group. Applications for the second group are due by March 5, 1997. The third group includes refineries (SIC 2911), and petroleum transportation/terminals/storage facilities (SIC 4612 & 4613). Applications for the third group are due by July 5, 1998. The final group includes all remaining sources and those applications are due by March 5, 1999.
WHERE DO I APPLY FOR A PERMIT?
Contact our office and we will send you the appropriate forms. If you are unsure as to whether you need a permit you should request an Applicability Determination (AD). An AD is used to determine whether a particular source or operation is subject to the requirements of a rule. The AD fee is $250 and, generally, must contain the same information as a regular permit application. In addition, you may contact the Customer Assistance Program or Air Quality Division and request a pre-application submittal conference. Staff will meet with you to identify any areas needing further work. The easiest way to expedite issuance of your Part 70 permit is to ensure that the application is administratively and technically complete. Requests for forms may be sent to:
DEQ |
DEQ |
Air Quality Division |
Customer Assistance Program |
707 N. Robinson, Suite 4100 |
1000 N. E. 10th Street |
P.O. Box 1677 |
Oklahoma City, OK 73117-1212 |
Oklahoma City, OK 73101-1677 |
WHO CAN I CONTACT FOR MORE INFORMATION?
For general assistance contact our Customer Service Division, toll free at 1-800-869-1400, or for specific assistance contact the Air Quality Division at (405) 702-4100.
Example problem: Gas compression and dehydration station
Stationary source description:
(3) 1200 horsepower engines for compression:
Engine #1 operating at 700 rpm
Engine #2 operating at 1200 rpm
Engine #3 operating at 1200 rpm
Dehy burner: 750 MBtu/hr
Flash Tank
Stripping gas: 18 scfm
Electric pump for T.E.G.
Dehydration processes 26 MMSCFD
Maximum operating conditions:
| Stationary source Inlet: | Dehy Inlet: |
| Q = 26 MMSCFD | Q = 25.5 MMSCFD |
| Pin = 70 psig | Pin = 760 psig |
| Tin = 85 oF | Tin = 120 oF |
Calculate potential-to-emit
T.E.G. dehydration unit
Dehydrator potential-to-emit is defined by operation of the unit. By definition, potential-to-emit is the emission level that will occur at the maximum design capacity of the stationary source.
Possible methods of defining gas processing plant potential-to-emit:
Maximum throughput of compressors to define plant processing capability.
Consider max. inlet pressure; min. inlet temp; min. outlet press; max. compressor rpm. Some of these parameters may be contract requirements while others may have been stipulated in the construction permit.
Maximum BTEX and/or VOC content of gas stream.
Consider the stability of gas composition, contract limits on sales gas water content. Estimate emissions using GLYcalc program.
Maximum heat duty of regeneration equipment.
Consider water content of gas; sales gas water content; max. lean glycol recirculation ratio; %water in lean glycol (to determine stripping gas rate); max. temperature; and stable gas composition.
Maximum circulation rate of glycol pumps.
Consider gas composition; material balance of emissions between rich and lean glycol samples. This method may require additional evaluation of VOC content in glycol from flash tank and reboiler.
Potential-to-emit for T.E.G. dehydration unit using GRI's GLYCalc program
Gas Research Institute has developed a program to estimate the emissions from a glycol (T.E.G. or E.G.) regeneration unit. The results of the program have been found acceptable by the EPA. Another method of determining HAP potential-to-emit would be the material balance calculation comparing BTEX and n-C6 content from rich and lean glycol samples. To use the GRI-GLYCalc program, the following information is needed:
Gas composition AT DEHY INLET
Component |
Vol % |
Component (cont'd) |
Vol % |
C02 |
0.032 |
other C6s |
0.0190 |
H2S |
0.000 |
C7s |
0.0600 |
N2 |
14.97 |
2,2,4 Trimethylpentane |
0.000 |
C1 |
72.75 |
Benzene |
0.0002 |
C2 |
6.181 |
Toluene |
0.0001 |
C3 |
3.836 |
Xylenes |
0.0000 |
C4s |
1.562 |
C8+ |
0.0140 |
C5s |
0.4759 |
||
n-C6 |
0.083 |
Other GRI-GLYCalc input for maximum throughput conditions:
Gas is saturated |
Yes |
Lean glycol recirc. ratio of |
3.00 gals/lb H20 |
Type of stripping gas |
dry gas |
Stripping gas flow rate: |
18 scfm |
Dry gas dewpoint: |
7 lbs. H20/MMSCF |
Lean glycol concentration: |
99.95% T.E.G. |
Flash tank op. Conditions: |
60 psi, 110 oF |
Output: GRI-GLYCalc estimated air emissions
Glycol Type: T.E.G. Annual Hours of Operation: 8,760 hrs Dry Gas Flow Rate: 25.5 MMSCF/day Wet Gas is saturated with water: Yes Calculated Wet Gas Water 129 lbs H20/MMSCF Specified Dry Gas Dew Point: 7.00 lbs H20/MMSCF Calculated Absorber Stages: 1.69 Specified Lean Glycol Recirc.: 3.00 gals/lb H20 Glycol Losses Down Pipe: 0.0681 lbs/hr Glycol Pump Type: Gas Driven Recirc. Pump: Electric Regenerator Stripping Gas: Dry Product Gas Stripping Gas Flow Rate: 18 scfm
Uncontrolled regenerator emissions
| Component | lbs/hr | lbs/day | tons/yr |
| n-Hexane | 1.52 | 33.4 | 6.64 |
| Benzene | 0.0591 | 1.42 | 0.259 |
| Toluene | 0.0528 | 1.27 | 0.231 |
| Total H-C Emissions | 58.4 | 1401 | 256 |
| Total VOC Emissions | 19.0 | 457 | 83.4 |
| Total HAP Emissions | 1.63 | 39.0 | 7.13 |
| Total BTEX Emissions | 0.112 | 2.68 | 0.490 |
Flash tank offgas emissions
Component lbs/hr lbs/day tons/yr n-Hexane 0.300 7.19 1.31 Benzene 0.0008 0.020 0.0037 Toluene 0.0004 0.010 0.0018 Total H-C Emissions 19.5 468 85.4 Total VOC Emissions 8.49 204 37.2 Total HAP Emissions 0.301 7.22 1.32 Total BTEX Emissions 0.0012 0.030 0.0055
Dehydration unit total emissions
| Pollutant | Tons/yr |
| n-Hexane | 7.95 |
| Benzene | .263 |
| Toluene | .233 |
| Ethyl-Xylene | 0.0 |
| Xylene | 0.0 |
| Total BTEX Emissions | .496 |
| Total HAP Emissions | 8.45 |
| Total VOC Emissions | 121 |
Potential-to-emit for dehy regenerator heater
The dehy regenerator is used to heat the rich glycol to 380+ degrees to boil off the water content of the glycol. The burner on the regenerator is thermostatically controlled to maintain a relatively constant temperature. However, for potential-to-emit calculations, the nameplate capacity of the burner is used with 8,760 hours per year of operation.
Using the nameplate design capacity for the regenerator potential-to-emit calculation:
Nameplate Reboiler Heat Duty: 750 MBtu/hr
AP-42 Factor for external fired natural gas boiler:
Units: million cubic feet, (MMSCF), burned
|
PM=PM10 |
SO2 |
NOx |
VOC |
CO |
Lead |
|
Lbs/unit |
Lbs/unit |
Lbs/unit |
Lbs/unit |
Lbs/unit |
Lbs/unit |
Nat. Gas |
3 |
.6 |
100 |
5 |
20 |
--- |
Dehy potential-to-emit regenerator calculations:
Calculate quantity of fuel used:
750 MBtu/hr x MSCF/1047 MBtu x MMSCF/ 103 MSCF= 7.16x10-4 MMSCF/hr
Calculate emissions for each pollutant:
3.0 Lbs of PM/MMSCF x 7.16x10-4 MMSCF/hr x 8760 hrs/yr x 1 ton/2000 Lbs = 0.0094 tons/year
0.6 Lbs of SOx/MMSCF x 7.16x10-4 MMSCF/hr x 8760 hrs/yr x 1 ton/2000 Lbs = 0.0019 tons/yr
100 Lbs of NOx/MMSCF x 7.16x10-4 MMSCF/hr x 8760 hrs/yr x 1 ton/2000 Lbs = 0.314 tons/yr
5.0 Lbs of VOC/MMSCF x 7.16x10-4 MMSCF/hr x 8760 hrs/yr x 1 ton/2000 Lbs = 0.0157 tons/yr
20 Lbs of CO/MMSCF x 7.16x10-4 MMSCF/hr x 8760 hrs/yr x 1 ton/2000 Lbs = 0.0627 tons/yr
Summary of potential-to-emit from dehy regenerator
PM=PMIO SO2 NOx VOC CO Lead tons/year tons/year tons/year tons/year tons/year tons/year 0.0094 0.0019 0.314 0.0157 0.0627 ---
Summary of pollutants so far....
| Pollutant | Tons/yr | Pollutant | Tons/yr |
| n-Hexane | 7.95 | PM | 0.0094 |
| Benzene | .263 | PM10 | 0.0094 |
| Toluene | .233 | S02 | 0.0019 |
| Ethyl-Xylene | 0.0 | NOx | 0.314 |
| Xylene | 0.0 | CO | 0.0627 |
| Total BTEX Emissions | .496 | ||
| Total HAP Emissions | 8.45 | ||
| Total VOC Emissions | 121 |
Compressor engine equipment
Equipment description:
(3) 1200 horsepower engines for compression
Engine #1 operating at 700 rpm
Engine #2 operating at 1200 rpm
Engine #3 operating at 1200 rpm
Pollutants for emissions from engines are reported in different ways. AP-42 lists units in lbs/MMBtu while the various manufacturers' data generally lists emission factors in grams/hp-hr. Make sure units are used correctly in calculating potential-to-emit in tons per year.
Note that these are potential-to-emit calculations. By definition, this is the emission level that will occur at the maximum design capacity of the stationary source. Original construction permits often list the conditions at which an engine-compressor unit will be operated such as rpm, horsepower load, and air-fuel ratios. If conditions are listed in a previous permit, you may calculate potential-to-emit under the permitted conditions. However, to be used in the potential-to-emit calculations, the conditions must be "federally enforceable".
The table below lists the maximum continuous operating conditions for the given engines:
Engine |
RPM @ max oper.conditions |
Horsepower @ max. Continuous Load |
Fuel Usage MMBtu/hr |
Engine #l, (RB) |
1200 |
907 |
6.84 |
Engine #2, (LB) |
1200 |
1200 |
10.79 |
Engine #3, (LB) |
1200 |
1085 |
8.17 |
Potential-to-emit calculation for each engine
From this data, with the conditions specified, the potential-to-emit for each engine is calculated:
Find appropriate emissions factors for the engines:
Manufacturer's Emission Factors, (grams/hp-hr)
| S02 | NOx | CO | VOC | |
| Engine# 1 (RB) | 7 | 28 | 0.3 | |
| Engine #2 (LB) | 1.5 | 2.65 | 1.0 | |
| Engine #3 (LB) | 1.2 | 1.94 | 0.5 |
S02 emission factor of 0.6 lbs/MMCF and PM10 factor of .003 grams/hp-hr are from AP-42 for natural gas fired internal combustion engines.
Knowing the horsepower and fuel for a given engine's operating conditions, the following calculations are made:
Engine #1 NOx calculation:
907 HP x 7 grams/hp-hr x 8760 hrs/year x 1 lb/454 grams x 1 ton/2000 Lbs = 61.3 tons/yr
Engine #1 S02 calculation using AP-42 factor:
6.84 MMBtu/hr x MMCF/103 MMBtu x 0.6 Lbs/MMCF x 8760 hrs/year 1 ton/2000 Lbs = 0.018 tons/year
Compressor engine potential-to-emit calculation summary
Applying these equations for each pollutant, for each engine at maximum continuous operating conditions the results are as follows:
Units = tons/year
| NOx | S02 | CO | VOC | PM=PM10 | |
| Engine #1 (rich burn) | 61.3 | 0.018 | 245 | 2.63 | 0.026 |
| Engine #2 (lean burn) | 17.4 | 0.028 | 30.7 | 11.6 | 0.035 |
| Engine #3 (lean burn) | 20.3 | 0.022 | 12.6 | 5.23 | 0.031 |
Engine Totals 99.0 0.068 288 19.5 0.092
Potential-to-emit for gas compression station
| Pollutant | Tons/yr | Pollutant | Tons/yr |
| n-Hexane | 7.95 | PM | 0.101 |
| Benzene | .263 | PM10 | 0.101 |
| Toluene | .233 | S02 | 0.0699 |
| Ethyl-Xylene | 0.0 | NOx | 99.3 |
| Xylene | 0.0 | CO | 288 |
| Total BTEX Emissions | .496 | ||
| Total HAP Emissions | 8.45 | ||
| Total VOC Emissions | 141 |
Note that emissions of HAPs do not exceed 10 TPY for any one HAP or 25 TPY for all HAPs. Thus, it isnt a major source for HAPs. However, emissions of CO exceed 100 TPY. Therefore, this facility is a major (Title V) source. If CO emissions from Engine #1 could be limited (by restricting hours of operations, installing control equipment, etc) to less than 56.7 TPY (100-30.7-12.6 TPY), this source would be considered a "synthetic minor" and thus would not be required to obtain a Part 70 permit.
Fugitive emissions calculations
When determining the necessity of a Title V permit, fugitive emissions must be considered when calculating potential-to-emit if the stationary source is a federally designated fugitive emission source as defined in OAC 252:100-8-3 (a)(1).
In addition to the 26 fugitive emission sources listed in OAC 252:100-8-3 (a)(1), certain NSPS source categories must include fugitive emission calculations.
If the emission source is within a source category that is regulated by an NSPS that was promulgated on or before August 7, 1980, then fugitive emissions from the emission source must be included when calculating potential-to-emit. However, fugitive emissions must be calculated only for those pollutants that are regulated by the NSPS for that source category.
For example, fugitive emissions of NOx and S02 from gas turbines must be included in determining whether a stationary source is required to obtain a Title V permit. In this case, fugitives are included regardless of whether that particular gas turbine is subject to an NSPS. This is because an NSPS limiting NOx and SOx emissions from gas turbines was promulgated before August 7, 1980, (40 CFR Part 60, Subpart GG).
Remember that a fugitive emission is one that can't reasonably be collected and routed through a stack or vent (e.g., dust from roads, slag piles, and other such sources).
Title V Permit Application
Note that once it is determined that a Title V operating permit is needed, fugitive emissions are required to be reported in the Title V operating permit application even though fugitive emissions were not required to be included in the calculations to determine whether a Title V operating permit was needed.
March 23, 1999
This publication is issued by the Oklahoma Department of Environmental Quality authorized by Mark S. Coleman, Executive Director. Copies have been prepared at a cost of $0.0035 each. Copies have been deposited with the publications clearinghouse of the Oklahoma Department of Libraries.